What the bank means by a project report
A project report, also called a detailed project report or DPR, is the document a bank studies before it sanctions a term loan. It introduces the promoter and the business, costs the project, shows how that cost will be funded, and projects how the unit will sell, earn and repay over the years the loan runs. When a business applies to Punjab National Bank for plant and machinery, premises or another capital investment, this report is what the credit team appraises.
It helps to separate it from CMA data, which is the pack used for working capital limits. The project report answers what the investment is and whether it will repay; CMA data answers how much short-term finance the operating cycle can carry. A proposal that asks for both a term loan and a cash credit limit usually carries both documents.
When PNB asks for a project report
- A new unit, where the projections are the only evidence of repayment ability.
- A term loan for machinery, equipment or construction, where the bank wants the cost and its funding in one place.
- Expansion or modernisation of an existing unit, where the report sits beside the audited history.
- A scheme application, such as Mudra or PMEGP, where the same structure is used with the scheme's own limits.
- A working capital enhancement, where forward-looking statements are asked for rather than only historical accounts.
The format, section by section
Promoter and business profile
Constitution, activity, location, year of commencement, PAN, GST and Udyam references, and the particulars of promoters or partners, including relevant experience. For a new unit this section carries more weight than usual, because it is where the bank checks whether the people running the project have done anything similar before.
Project description
What is being set up or expanded, the capacity proposed, the technology or process, plant and machinery with suppliers and quotations, land and building details, and the utility and manpower requirements. Quotations for the main equipment should be attached, since they are the support for the cost figures.
Project cost
Every rupee of the project must appear here and nowhere else. A typical breakdown, for a manufacturing unit, looks like this:
| Cost line | What it covers |
|---|---|
| Land and site development | Purchase, lease, levelling and approach works |
| Building | Factory shed, office, stores and civil works |
| Plant and machinery | Main equipment, installation and freight |
| Miscellaneous fixed assets | Tools, furniture, electricals, vehicles |
| Preliminary and preoperative expenses | Registration, trial runs, interest during construction |
| Margin for working capital | The promoter's share of the short-term requirement |
| Contingencies | A provision for cost escalation |
Means of finance
The funding side must add back to the project cost exactly. Own contribution, one or more term loans, the working capital limit and any subsidy are listed as separate sources. Promoter contribution is read as a measure of commitment, and for scheme loans the minimum contribution is fixed by the scheme. Where a capital subsidy is expected, state whether it is a flat amount or a percentage of the loan, and when it is released, because both affect the repayment schedule.
Market and revenue assumptions
Demand for the product, the market the unit will serve, competition, and how capacity and utilisation translate into sales for each year. This is where the sales figures in the projections are defended. A capacity utilisation of 40% in year one rising to 80% over four years is a statement a credit officer can test against the industry; a flat 90% from the first month is not.
Projected financial statements
The profit and loss account runs from sales through direct costs, gross profit, indirect expenses, interest, depreciation, tax and net profit. The projected balance sheet shows assets, liabilities and net worth with each year's closing position carried forward into the next. The cash flow statement shows the movement in cash, and the depreciation chart supports the fixed-asset blocks. Where the business earns unevenly through the year, month-wise revenue and expense rows show the pattern instead of dividing the year by twelve.
Repayment and DSCR
The EMI schedule sets out the opening balance, instalment, principal, interest and closing balance for each loan, month by month, including a moratorium where the loan starts later. DSCR is computed for each year as net profit plus depreciation plus term-loan interest, divided by principal plus interest, with an average across the repayment period. A year where cover falls below one is not fatal, but it has to be explained.
Break-even and ratio analysis
Break-even shows the sales value at which the unit covers its fixed and variable costs, as an amount and as a share of sales, with the margin of safety above it. Ratio analysis covers liquidity, profitability, leverage and solvency measures, including the current ratio, debt-equity, TOL/TNW, interest coverage and return on capital employed, each shown with its formula so the figures can be reconciled to the statements.
Where project reports usually fall short
- Project cost and means of finance that do not agree, leaving the bank to work out the gap.
- Sales projections with no capacity, market or order-book support behind them.
- Interest and depreciation in the projections that do not match the loan terms and the asset schedule.
- A balance sheet that balances only because of a plug figure.
- DSCR shown as an average without the yearly figures.
- Break-even presented as a single number, with no note of the fixed and variable cost split it rests on.
- Scheme conditions, such as promoter contribution or subsidy treatment, that the projections ignore.
Preparing the report with the workings attached
Finxora's project report software builds the document from one set of inputs. You enter the promoter and business profile, the project cost lines, the means of finance with one or more term loans and any subsidy, and the revenue and expense assumptions, and the profit and loss account, projected balance sheet, cash flow, depreciation chart, EMI schedules, DSCR, ratio analysis, break-even, turnover method and MPBF all calculate from those figures. Change an assumption and every dependent statement recalculates, so the two sides of the balance sheet and the debt service working stay in step.
The project master can be tagged as Mudra, PMEGP, Normal MSME or a custom scheme type, and the same structure serves a plain term-loan proposal. Projections can run to the twenty-five years the master allows, which covers long-tenure term loans. At download you choose which sections to include, add a cover page, index and narrative, and export the report as PDF, Word or Excel. A CA and UDIN block can be printed under each statement where the firm signs the report.
Compare the section order with the bank's checklist by opening a filled sample project report. The project report software page describes each statement the generator produces, and plan details sit on the project report pricing page.
Before submitting to the branch
- Project cost equals means of finance, and the promoter's contribution meets the scheme or bank requirement.
- Equipment quotations and cost estimates are attached behind the cost sheet.
- Every projected year's balance sheet balances without a plug.
- DSCR is shown year by year and as an average, with any year below one explained.
- Break-even and ratio workings are attached so the figures can be traced.
No format guarantees a sanction, and it would be wrong to suggest otherwise. What a complete report does is put the investment, the funding and the repayment case in front of the credit team in the order they read it.